Metrika

  • citati u SCIndeksu: [1]
  • citati u CrossRef-u:[2]
  • citati u Google Scholaru:[]
  • posete u poslednjih 30 dana:1
  • preuzimanja u poslednjih 30 dana:1

Sadržaj

članak: 1 od 1  
2017, vol. 45, br. 4, str. 670-677
Merenje performansi energetskih procesa u češkim kompanijama
aTomas Bata University in Zlín Faculty of Management and Economics, Czech Republic
bTomas Bata University in Zlín Faculty of Logistics and Crisis Management, Czech Republic

e-adresatucek@fame.utb.cz
Ključne reči: energy processes; energy management; performance measurement (PM); key performance indicators; performance management (PM) concepts
Sažetak
Deo istraživanja prikazan u ovom radu bavi se merenjem performansi energetskih procesa i pristupa u češkim proizvodnim kompanijama (navedenim u daljem tekstu). Cilj istraživanja je bio da se proveri i opiše situacija u oblasti energetskih procesa u češkim proizvodnim kompanijama. Autori su utvrdili i opisali glavne uticaje i aktuelan pristup industrijskih kompanija merenju performansi energetskih procesa (cene energenata i analiza potrošnje, aktuelan nivo korišćenja merenja performansi u kompaniji uopšte i direktno u oblasti energetike, primena metoda upravljanja performansom, korišćeni ključni pokazatelji performanse). Rezultati su dobijeni iz autputa kvantitativnih istraživanja. Utvrđeno je da energetski procesi, kao glavna podrška baznim procesima, nisu mapirani, opisani, niti rezimirani u jednom dokumentu kako bi se povećala efikasnost upravljanja i merenje performansi. Metode merenja nisu korišćene za energetske procese. Ključni pokazatelji performansi, koji su obuhvaćeni sistemom merenja performansi, nisu navedeni, osim što su pokazatelji protoka fizičke energije primenjeni u lokalnim sistemima. Ovo je prikazano variranjem cena energenata, odnosno njihovim povećanjem, nenavođenjem podataka o korišćenju uglja i rudarstvu, pritisku da se smanji potrošnja, smanji emisija CO2 i potrebe da se brzo reaguje kod potrošnje različitih energenata.
Reference
*** (2010) Colsys automatik: Co je energetický management?. Kladno, http://www.indetcon.cz/co-je-energetickymanagement, February, 2010-02-10
Bunse, K., Vodicka, M., Schönsleben, P., Brülhart, M., Ernst, F.O. (2011) Integrating energy efficiency performance in production management - gap analysis between industrial needs and scientific literature. Journal of Cleaner Production, 19(6-7): 667-679
Capehart, B.L., Turner, W.C., Kennedy, W.J. (2008) Guide to energy management. New York: Fairmont Press, 6th issue, pp. 625
Czech Office for Standards (2010) Metrology and testing: ČSN EN 15241 maintenance - maintenance key performance indicators. pp. 23
Czech Statistical Office (2011) Public database-energy industries. http://www.czso.cz/csu/produkty.nsf/podskupina?openform&:2010-E81
Deming, W.E. (1993) The new economics for industry, government & education. Cambridge: Massachusetts Institute of Technology Center for Advanced Engineering Study, 2nd edition
Department of Trade and Industry - United Kingdom (1995) How to measure performance: A handbook of techniques and tools. www.dti.gov.uk/quality/performance, pp.7
Dickens, Ch., Gould, K. (2010) Process as an asset. BP trends, http://www.bptrends.com/publicationfiles/0708ARTProcess%20as%20an%20AssetDicken%20and%20Gould-final.doc.pdf
Energy Regulation Office (2012) Gas deliveries and consumption prognosis 2012-2021. http://www.eru.cz/user_data/files/plyn/40_statistika/prognoza/Desetileta%20prognoza.pdf
Eschenbach, R. (2004) Controlling. Prague: Aspi publisher, pp. 816
Franco-Santos, M., Kennerley, M., Micheli, P., Martinez, V., Mason, S., Marr, B., Gray, D., Neely, A. (2007) Towards a definition of a business performance measurement system. International Journal of Operations & Production Management, 27(8): 784-801
Gill, J., Johnson, J.P. (1991) Research methods managers. London: Paul Chapman Publishing Ltd, pp. 170
Gleich, R. (2002) Performance Measurement als Controllingaufgabe. u: Controlling Fortschritte, München: Verlag Vahlen, pp. 49-75
International Energy Agency IEA guide to reporting energy RD&D budget: Expenditure statistics. http://www.iea.org/stats/rd.asp
Kaplan, R.S., Norton, D.P. (2000) Balanced scorecard. Prague: Management Press, pp. 267, 1st issue
Lerher, T., Edl, M., Rosi, B. (2013) Energy efficiency model for the mini-load automated storage and retrieval systems. International Journal of Advanced Manufacturing Technology, 2013, s. 1-19
Lord, K.W.T. (1883) Lecture to the institution of civil engineers. http://www.todayinsci.com/K/Kelvin_Lord/Kelvin_Lord.htm
Ministry of Industry and Trade of CR (2007) National energy efficiency action plan of the Czech Republic. April 2007, https://www.mpo.cz/assets/dokumenty/55405/63436/653021/priloha003.pdf, 2017-05-17
Ministry of Industry and Trade of CR (2011) National energy efficiency action plan of the Czech Republic. August 2011, https://www.mpo.cz/assets/dokumenty/55405/63436/653022/priloha002.pdf, 2017-05-17
Ministry of Industry and Trade of C.R. (2014) National energy efficiency action plan of the Czech Republic. October 2014, https://www.mpo.cz/assets/dokumenty /55405/63436/653023/priloha001.pdf, 2017-05-17
Ministry of Industry and Trade of C.R. (2016) National energy efficiency action plan of the Czech Republic. February 2016, https://www.mpo.cz/assets/en /energy /energy-efficiency/strategic-documents/2016/12/CZ_neeap_update_2-2016_en_3.pdf, 2016, 2017-05-17
Ministry of Industry and Trade of CR (2010) State energetic conception. February, http://www.mpo.cz/dokument5903.html, 2017-05-17
Neely, A., Gregory, M., Platts, K. (1995) Performance measurement system design. International Journal of Operations & Production Management, 15(4): 80-116
Novák, Z. (2011) Energy processes management and valuation in production companies using key performance indicators according to sampled methods from performance measurement system. Zlín: Tomas Bata University, pp. 11; Thesis of dissertation
Torcellini, P., Pless, S., Griffith, B., Judkoff, R. (2005) Evaluation of the energy performance and design process of the thermal test facility at the national renewable energy laboratory: Operated for the U.S. Department of Energy. http://www.osti.gov/bridge, pp.12-123
Tucek, D., i dr. (2009) Business process management with software support. u: 13th International Business Information Management Association Conference: Knowledge Management and Innovation in Advancing Economies Analyses & Solutions, Proceedings, Norristown: IBIMA, pp. 1060-1073
Tuček, D., Zámečník, R. (2007) Business process management and performance measurement in practical. Technical University Zvolen, pp. 206
Tučková, Z., i dr. (2012) Electric energy department analysis. u: TBU and Barum Continental common project presentation, Otrokovice
 

O članku

jezik rada: engleski
vrsta rada: neklasifikovan
DOI: 10.5937/fmet1704670T
objavljen u SCIndeksu: 22.02.2018.
Creative Commons License 4.0

Povezani članci

Nema povezanih članaka