Numerical solution of the age structure optimization problem for basic types of power plants
(naslov ne postoji na srpskom)
Melentiev Energy Systems Institute SB RAS, Irkutsk, Russia

e-adresa: markova@isem.irk.ru, inna.sidler@mail.ru

Projekat

The work was carried out within the framework of the scientific project III.17.3.2 of the program of fundamental research of the SB RAS, reg. No. AAAA-A17-117030310446-6.
Research has been supported in part by the Russian Foundation for Basic Research under Grant 15-01-01425.

Sažetak

(ne postoji na srpskom)
Our paper addresses an integral model of the large electric power system optimal development. The model takes into account the age structure of the main equipment, which is divided into several types regarding its technical characteristics. This mathematical model is a system of Volterra type integral equations with variable integration limits. The system describes the balance between the given demand for electricity, the commissioning of new equipment and the dismantling of obsolete equipment, as well as the shares of different types of power plants in the total composition of the electric power system equipment. Based on the developed model, we got numerical solution to the problem of finding the optimal strategy for replacing equipment with a minimum of the cost functional. The case study is the Unified Electric Power System of Russia. Calculations of the forecast for development of the electric power system of Russia until 2050 were made using real-life data.

Ključne reči

Integral Models of Developing Electric Power Systems; Lifetime; Optimization Problem; Numerical Solution