Model upravljanja diskontinualnim sistemima eksploatacije u uslovima P.K. 'Bogutovo Selo'
aUniverzitet u Banjoj Luci, Rudarski fakultet, Prijedor, Republika Srpska, BiH
bMDP Elektroprivreda RS, ZDP RiTE Ugljevik, Ugljevik, Bosna i Hercegovina

e-adresa: vladimir.malbasis@rf.unibl.org

Sažetak

U ovom radu se obrađuje razvoj i primjena modela upravljanja diskontinualnim sistemom eksploatacije u radnim uslovima P.K. 'Bogutovo Selo' Ugljevik. Definisanje ovog modela je doprinos globalnim trendovima i nastojanjima da se informacione tehologije koriste u što većem obimu za potrebe modelovanja upravljanja i optimizacije rudarskih proizvodnih procesa u cilju postizanja ekonomske održivosti poslovanja. U tom smislu su korišćene informacione tehnologije i tehnike upravljanja uz detaljna istraživanja diskontinualnih sistema eksploatacije i specifičnosti sa velikim brojem uticajnih parametara i varijabli koje uveliko definišu način korišćenja procesa upravljanja. Analizirani su efekti primene razvijenog modela u realnim uslovima i konstatovano je de se optimizacijom procesa može značajno uticati na povećanje kapaciteta diskontinualnih sistema, zavisno od veličine sistema i radnih uslova na samom kopu.

Ključne reči

površinski kop; proizvodnja; diskontinualni sistem; statistika; sistem bager-kamion; simulacija

Reference

Alarie, S., Gamache, M. (2002) Overview of Solution Strategies Used in Truck Dispatching Systems for Open Pit Mines. International Journal of Surface Mining, Reclamation and Environment, 16(1): 59-76
Belyakov, N. (2013) Modeling Development of Deep Horizons of Open Pits. pp 43-51
Burt, C. N., Caccetta, L. (2007) Match factor for heterogeneous truck and loader fleets. International Journal of Mining, Reclamation and Environment, 21(4): 262-270
Drebenstedt, C. (2013) The Responsible Mining Concept. pp 3-22
Kolonja, B., Vasiljevic, N. (2000) Computer Simulation of Open-Pit Transportation Systems. Rotterdam: Balkema, pp. 613-618
Krause, A., Musingwini, C. (2007) Modelling open pit shovel- truck systems using the Machine Repair Model. Journal of the Southern African Institute of Mining and Metallurgy, Volume 107, Number 8, pp. 469-476
Liu, J., Bongaerts, J.C. (2014) Mine Planning and Equipment Selection Supply Chain of Rare Earth Elements (REEs). u: Drebenstedt, Carsten; Singhal, Raj [ur.] Mine Planning and Equipment Selection, Cham: Springer Science and Business Media LLC, : 1419-1426
Malbašić, V. (2007) Model for evaluation of transport systems in the function of long-term planning of surface mines. Belgrade: University of Belgrade, RGF, doctoral dissertation
Milošević, D. (2018) A model of management of discontinuous exploitation. Prijedor. Bosnia and Herzegovina: University of Banja Luka - Faculty of Miningr, doctoral dissertation
Necmettin, Ç. (2004) Open pit truck / shovel haulage system simulation. The Graduate School of Natural and Applied Sciences of the Middle East Technical University-Department of Mining Engineering, PhD thesis
Newman, A.M., Rubio, E., Caro, R., Weintraub, A., Eurek, K. (2010) A Review of Operations Research in Mine Planning. INFORMS Journal on Applied Analytics, 40(3): 222-245
Panagiotou, G., Michalakopoulos, T., ur. (2000) Mine planning and equipment selection. 547-553
White, J., Arnold, M.J., Clavenger, J.G. (1982) Automated Open-Pit Truck Dispatching at Tyrone. Engineering and Mining Journal, vol. 183, no. 6, pp. 76-84