|
Reference
|
|
Abdollahi, S., Jafarpour, A., Yousefi,, S. (2020) A Hybrid Fuzzy MCDM Approach to Determine an Optimal Block Size in Open-Pit Mine Modeling: A Case Study. Journal of Mining and Environment (JME), 11(2): 611-627
|
|
Coombes, J. (2004) Resource Estimation. Snowden Mining Industry Consultants
|
|
Cupić, M., Tummala, R., Suknović, M. (2001) Decision making: Formal approach. Belgrade: Faculty of Organizational Sciences
|
|
David, M. (1971) Geostatistical Ore Reserve calculation, step by step Case Study: Decision Making in the Mineral Industry. CIM Bulletin, 12: 185-191
|
4
|
David, M. (1977) Geostatistical Ore Reserve Estimation. Amsterdam: Elsevier
|
|
Đenadic, S., Ignjatović, D., Tanasijević, M., Bugarić, U., Janković, I., Šubaranović, T. (2019) Development of the Availability Concept by Using Fuzzy Theory with AHP Correction, a Case Study: Bulldozers in the Open-Pit Lignite Mine. Energies, 12(21): 4044-4044
|
|
Hayati, M., Rajabzadeh, R., Darabi, M. (2015) Determination of optimal block size in Angouran mine using VIKOR method. Journal of Materials and Environmental Science, 6(11): 3236-3244
|
|
Janković, I., Djenadic, S., Ignjatovic, D., Jovancic, P., Subaranovic, T., Ristovic, I. (2019) Multi-Criteria Approach for Selecting Optimal Dozer Type in Open-Cast Coal Mining. Energies, 12(12): 2245-2245
|
1
|
Journel, A.G., Huijbregts, C.J. (1978) Mining geostatistics. New York: Academic Press London
|
|
Lee, A.H.I., Chen, W.C., Chang, C. (2008) A fuzzy AHP and BSC approach for evaluating performance of IT department in the manufacturing industry in Taiwan. Expert Systems with Applications, 34(1): 96-107
|
|
Leuangthong, O., Neufeld, C., Deutsch, C.V. (2003) Optimal Selection of Selective Mining Unit (SMU) Size. u: International Conference on Mining Innovation (MININ), Santiago, Chile, 1-16
|
2
|
Mahdavi, I., Mahdavi-Amiri, N., Heidarzade, A., Nourifar, R. (2008) Designing a model of fuzzy TOPSIS in multiple criteria decision making. Applied Mathematics and Computation, 206(2): 607-617
|
|
Rahimdel, M.J., Bagherpour, R. (2018) Haulage system selection for open pit mines using fuzzy MCDM and the view on energy saving. Neural Computing and Applications, 29(6): 187-199
|
|
Saaty, R. (1987) The Analytic Hierarchy Process. Mathematical Modelling, 9(3-5): 161-176
|
1
|
Saaty, T. (2003) Decision-making with the AHP: Why is the principal eigenvector necessary. European Journal of Operational Research, 145(1): 85-91
|
1
|
Saaty, T.L., Vargas, L.G. (2012) Models, Methods, Concepts & Applications of the Analytic Hierarchy Process. New York: Springer US, 2nd ed
|
38
|
Saaty, T.L. (1980) The Analytic Hierarchy Process. New York, NY, USA: McGraw-Hill
|
|
Sinclair, A.J., Blackwell, G.H. (2002) Applied Mineral Inventory Estimation. United Kingdom: Cambridge University Press
|
|
Sitorus, F., Cilliers, J.J., Brito-Parada, P.R. (2019) Multi-criteria decision making for the choice problem in mining and mineral processing: Applications and trends. Expert Systems with Applications, 121: 393-417
|
|
Stevanović, D. (2015) Optimization and planning of surface mines by stochactic models. Belgrade: University of Belgrade - Faculty of Mining and Geology
|
|
Stevanović, D., et al. (2020) Application constraines of optimization algorithms in the case of coal mines. u: XIV International Conference OMS 2020,Zlatibor: Yugoslavian Committee for Surface Exploitation, Proceedings, Belgrade, 76-87
|
3
|
Stevanović, D., Lekić, M., Krzanovic, D., Ristović, I. (2018) Application of MCDA in Selection of Different Mining Methods and Solutions. Advances in Science and Technology Research Journal, 12(1): 171-180
|
|
|
|