2017, br. 3-4, str. 11-20
Redistribution of excavation equipment for the purpose of achieving the desired capacity and improvement the utilization time of equipment
(naslov ne postoji na srpskom)
Institut za rudarstvo i metalurgiju, Bor

e-adresaaleksandar.doderovic@irmbor.co.rs
Projekat:
Uticaj rudarskog otpada iz RTB-a Bor na zagađenje vodotokova sa predlogom mera i postupaka za smanjenje štetnog dejstva na životnu sredinu (MPNTR - 37001)

Ključne reči: equipment redistribution; operation technology change; utilization time; OP Gacko
Sažetak
(ne postoji na srpskom)
Minor or greater deviations from the designed technological solutions are mainly due to two reasons: deviation from the design solutions in the previous period as a consequence of organizational factors, and as a consequence of changed parameters of the working environment in relation to those used in the planning and design phase. Adjusting to the newly created situation at the open pit, and in order to ensure a continuous supply of the customer/consumer with the mineral raw materials or fuel, as well as processing (discovery) the new quantities of mineral raw materials that still need to be exploited, it is sometimes convenient to redistribute the equipment at the open pit and adjust the technological parameters of operation to the concrete conditions. In order to improve the effects of equipment operation, reduce the costs and utilize the favorable weather conditions for work at the open pit Gacko - Central Field, a change of designed technology for operation rotor excavator II BTO system and relocation of excavation discontinuous equipment, organized as part of the combined system, has been carried out. This paper presents the technological - organizational measures implemented with the aim of more efficient use the existing excavation and transport capacities.
Reference
*** (2015) Strategy of mining: Technological opening, development, optimization and maintenance a continuity of coal production with introduction the enrichment method of dry separation coal at the open Pit Gacko. Bor: MMI, (in Serbian)
*** (2016) Main mining design of the Open Pit Gacko: Central field for the capacity of 2.3*106 t/year of the run-of-mine: Project of the open pit defense on water. Bor: MMI, (in Serbian)
Doderović, A., Stanić, N., Gomilanović, M. (2016) Protection system against water at the open pit Gacko with collective water collector as the capital structure. Mining and Metallurgy Engineering Bor, br. 4, str. 19-28
Stanić, N., Doderović, A., Stepanović, S., Gomilanović, M. (2016) Dynamics of development the works of roof coal series of the open pit Gacko by the software Gemcom Gems: Module cut evaluation. Mining and Metallurgy Engineering Bor, br. 4, str. 41-52
 