Akcije

Podzemni radovi
kako citirati ovaj članak
podeli ovaj članak

Metrika

  • citati u SCIndeksu: 0
  • citati u CrossRef-u:0
  • citati u Google Scholaru:[]
  • posete u poslednjih 30 dana:4
  • preuzimanja u poslednjih 30 dana:3

Sadržaj

članak: 2 od 17  
Back povratak na rezultate
2021, br. 38, str. 1-13
Methodology for selection of the variant for opening the deeper parts of the Toranica mine
(naslov ne postoji na srpskom)
Goce Delčev University, Faculty of Natural and Technical Sciences, Štip, N. Macedonia

e-adresazoran.despodov@ugd.edu.mk, nikolinka.doneva@ugd.edu.mk, stojance.mijalkovski@ugd.edu.mk, marija.hadzi-nikolova@ugd.edu.mk
Ključne reči: drift; central ore pass; decline; haulage; ore
Sažetak
(ne postoji na srpskom)
Opening an underground mine or part of it presents complex and responsible issue, which affects the economy and effectiveness of the mine operation. This paper presents a methodology for selecting the optimal variant for opening, the lead-zinc ore mine Toranica, Macedonia. Six variants of opening and haulage of ore and waste rocks in the deeper parts of the ore deposit have been considered. After the performed analysis, the optimal variant for opening and haulage for the Toranica mine was determined.
Reference
Despodov, Z., Mijalkovski, S. (2015) Otvoranje i razrabotka na rudni naoѓališta za podzemna eksploatacija. Štip: Univerzitet Goce Delčev, skripta, nepublicirana
Doneva, N. (2016) Principi vo rudarstvoto. Štip: Univerzitet Goce Delčev, skripta, nepublicirana
Gluščević, B. (1974) Otvaranje i metode podzemnog otkopavanja rudnih ležišta. Beograd: RGF
Jovanović, P. (1990) Izrada jamskih prostorija. Beograd: Univerzitet u Beogradu - Rudarsko geoloski fakultet, Knjiga I
Jovanović, P., Trajković, S., Tomašević, A. (1993) Methodical approach of mine opening economical solution defining and export selection method. u: 2nd International Conference on Mine Hauling and Hoisting, RGF Beograd, 95-100
Savić, L., Janković, R., Vidanović, N., Lutovac, S. (2011) The character of the of correlation between drilling speed and changes of the observed tehnical parameters in various working environments. Technics technologies education menagement, 6(2)
 

O članku

jezik rada: engleski
vrsta rada: izvorni naučni članak
DOI: 10.5937/podrad2138001D
primljen: 21.05.2021.
prihvaćen: 11.06.2021.
objavljen u SCIndeksu: 23.07.2021.
Creative Commons License 4.0

Povezani članci

Nema povezanih članaka