2021, vol. 76, br. 6, str. 843-849
|
Sewer collector on the Herceg Novi Riviera, an example of management and construction of a large project
(naslov ne postoji na srpskom)
Sažetak
(ne postoji na srpskom)
The paper presents the technical solution of the main sewer collector on the Herceg Novi Riviera, which was built from 2008 to 2019, as a gravity-pushing pipeline. It is located in the trunk of the coastal road-pedestrian road, with 11 pumping stations, connected in a row. The collector is connected to the Herceg Novi sewage system through a wastewater treatment plant, located in the central part of the municipality, in Meljine. It is presented through technical problems that are reflected in its functionality.
|
|
|
Reference
|
|
*** (2006) Studija Opravdanosti za Odlaganje otpadnih Voda Crnogorskog Primorja. Koblenca, Nemačka: KOCKS Consult GmbH
|
|
*** (2018) Projekat održavanja objekta priobalnog kolektora od Igala do Meljina - rekonstrukcija stare pumpne stanice Meljine HN-E. Sveska 6: 06 Jun
|
|
*** (2007) Water Supply and Wastewater Disposal. u: Adriatic Coast in Montenegro Final Study Report, III
|
|
*** (2016-2019) Zakon o komunalnim djelatnostima. Službeni list Crne Gore, br.33/16, 55/16, 74/16,2/18, 66/19
|
|
*** (2014/2018) Zakon o zaštiti i zdravlju na radu. Sl. list CG, br. 34 i 44
|
|
*** (2018) Projekat održavanja objekta PS Meljine kružni tok HN-D. 01 Jun
|
|
*** (2018) Projekat održavanja objekta priobalnog kolektora od Igala do Meljina - rekonstrukcija PS Forte Mare HN-E. Sveska 4, 04 Jun
|
|
*** (2018) Projekat održavanja objekta priobalnog kolektora od Igala do Meljina - rekonstrukcija PS Savina HN-E. Sveska 5, 05 Jun
|
|
Dahlem consultion (2019) Water supply and sanitation Adriatic Coastal programme. Montenegro
|
|
|
|