Akcije

Yugoslav Journal of Operations Research
kako citirati ovaj članak
podeli ovaj članak

Metrika

  • citati u SCIndeksu: 0
  • citati u CrossRef-u:0
  • citati u Google Scholaru:[]
  • posete u poslednjih 30 dana:0
  • preuzimanja u poslednjih 30 dana:0

Sadržaj

članak: 4 od 8  
Back povratak na rezultate
2007, vol. 17, br. 2, str. 245-256
Effects of the application of conventional methods in the process of forming the pick-up trains
(naslov ne postoji na srpskom)
aUniverzitet u Beogradu, Saobraćajni fakultet
bUniverzitet u Beogradu, Fakultet organizacionih nauka
Ključne reči: technical freight yards; forming the pick-up; conventional methods; simulation
Sažetak
(ne postoji na srpskom)
This paper examines a problem of forming the pick-up trains by conventional methods (the Futhner method and Special method), aiming at establishing basic characteristics of track facilities and values of shunting operations indicators important for evaluation of the effects of these methods application. The problem under consideration has so far not been examined in the literature to a sufficient extent, although in practice it has been proved to be necessary. For this reason, in this work a simulation study has been undertaken the results of which have to give the values and measures for assessing the quality of station/yard operations, as well as the assessment of new-designed station solutions.
Reference
*** (1988) Wolverine Corp. u: GPSS/H Reference Manual, Anandale
Banks, J., Carson, J.S. (1984) Discrete-event system simulation. Englewood Cliffs, NJ, itd: Prentice Hall
Branks, J., Carson, J.S., Ngosy, J. (1989) Getting started with GPSS/H. Annandale: Software Corporation
Henriksen, O.J., Crain, R. (1989) GPSS/H Reference Manual. Wolverine Software Corporation
Ivić, M. (1992) The optimization of the introduction of connecting lines siding's structure and capacity in technical railway stations. Belgrade: Faculty of traffic and transport engineering, Doctoral dissertation
Ivić, M., Marković, A., Lazić, Z. (1996) The impact of the pickup train set structure to the switching work indicators in the process of final forming. u: YUINFO '96, Brezovica, Proceedings
Janjić, M. (1970) Railway classification yards. Belgrade: Faculty of civil engineering
Milosevic, B. (1980) Railway stations and junctions. u: Privredno-finansijki vodic, Belgrade
Radenković, B.L., Stanojević, M., Marković, A.M. (1992) Računarska simulacija. Beograd: Fakultet organizacionih nauka / FON
Schriber, T.J. (1974) Simulation using GPSS. New York, itd: Wiley
Valette, B. (1940) Formation des trains de détail par la méthode de la formation simultanée. Revue generale des Chemins de fer, 3-4 131
 

O članku

jezik rada: engleski
vrsta rada: neklasifikovan
DOI: 10.2298/YJOR0702245I
objavljen u SCIndeksu: 23.01.2008.