|
References
|
1
|
Adler, G.L., Nanda, R. (1974) The effects of learning on optimum lot size determination: Single product case. AIIE Trans, 6 14- 20
|
|
Aggarwal, S.C. (1985) Making sense of production operations system. Harvard Business Review, September-October issue, 8-16
|
|
Axsater, S., Elmaghraby, S.E. (1981) A note on EMQ under learning and forgetting. AIIE Trans, 13 86-90
|
3
|
Cheng, T.C.E. (1991) An economic order quantity model with demand-dependent unit production cost and imperfect production processes. IEE Transactions, 23, 23-28
|
|
Conrad, C.J., Mcclamrock, N.H. (1987) The drilling problem: A stochastic modeling and control example in manufacturing. IEEE Transactions on Automatic Control, 32, 947-958
|
|
Drozda, T., Wick, C., Benedict, J.T., Veilleux, R.F., Bakerjian, R. (1983-1998) Tool and manufacturing engineers handbook: A reference book for manufacturing engineers, managers, and technicians. Dearborn, Mich: Society of Manufacturing Engineers
|
|
Fiacco, A.V., McCormick, G.P. (1966) Extension of SUMT for nonlinear programming: Equality constraints and extrapolation. Management Science, 12 816-828
|
5
|
Fiacco, A.V., McCormick, G.P. (1986) Nonlinear programming: Sequential unconstrained minimization techniques. New York, itd: Wiley
|
2
|
Gallego, G. (1993) Reduced production rates in the economic lot scheduling problem. Int J Prod. Res, 31, 1035-1046
|
1
|
Hax, A.C., Candea, D. (1984) Production and inventory management. Englewood Cliffs, N.J: Prentice-Hall
|
3
|
Khouja, M., Mehrez, A. (1994) An economic production lot size model with variable production rate and imperfect quality. Journal of the Operational Research Society, 45(12): 1405
|
1
|
Khouja, M. (1995) The economic production lot size model under volume flexibility. Computers and Ops. Res, 22. 515-523
|
1
|
Moon, I., Gallego, G., Simchi-Levi, D. (1991) Controllable production rates in a family production context. Int J Prod. Res, 29 2459-2470
|
1
|
Muth, E.J., Spearmann, K. (1983) Learning effects in economic lot size. Management Science, 29, str. 264-269
|
7
|
Porteus, E.L. (1986) Optimal lot sizing, process quality improvement and setup cost reduction. Operations Research, 34, 137-144
|
8
|
Rosenblatt, M.J., Lee, H.L. (1986) Economic production cycles with imperfect production processes. IIE Transactions, 18, str. 48-55
|
|
Schweitzer, P.J., Seidmann, A. (1991) Optimizing processing rates for flexible manufacturing systems. Management Science, 37 454-466
|
|
Sethi, A.K., Sethi, P.S. (1990) Flexibility in manufacturing: A survey. Int J Flexible Manufact. Systems, 2 289-328
|
|
Silver, E.A. (1990) Deliberately slowing down output in a family production context. Int J Prod. Res, 28 17-27
|
|
Sule, D.R. (1978) The effect of a alternate periods learning and forgetting on economic manufacturing quantity. AIIE Trans, 10 338-343
|
|
Sule, D.R. (1981) A note on production time variation EMQ under influence of learning and forgetting. AIIE Trans, 13 91-95
|
|
|
|